ANYDA is well acknowledged as one of the leading manufacturers of low temperature glycol water ice rink chiller -15c outlet in China. All of the products for sale are made in our professional plant. Should you're interested in it, please be free to get the high-tech equipment with competitive price from us.
-15C Outlet Low Temperature Glycol Water Ice Rink Chiller Description
1.Cooling medium can be ethylene glycol and salt water, the use of special materials and processes, to eliminate the phenomenon of corrosion and oxidation of the evaporator, the use of equipment to extend the cycle.
2.The use of brand-name imported compressor, low temperature performance, reliability and durability, high refrigeration efficiency, equipped with a high precision microcomputer controller, automatic operation, no need to be on duty.
3.The unit has the advantages of compact structure, scientific design appearance, full paint rust and corrosion, the protection function: short phase and reverse phase protection; compressor overload protection; low pressure protection device; automatic alarm device for water; low temperature, anti icing protection; water flow protection device;
4.According to the customer's use of different, the low temperature machine can do -40 water, ultra low temperature can reach -70 degrees, using low temperature linkage throttle technology, low temperature performance beyond imagination.
|
Item |
Specifications |
|
|
Cooling Capacity |
Model |
AYD-130AL |
|
kw/h |
196 |
|
|
Power Input |
kw |
143 |
|
Outlet Temp |
degree |
-15 |
|
Power Supply |
380V-3N-50HZ |
|
|
Refrigerant |
R404A |
|
|
Dimension(L*W*H) |
mm |
4800*2000*2100 |
|
Compressor |
Type |
Compressor |
|
Power(kw) |
138 |
|
|
Energy Control |
100%-75%-50%-25%-0 |
|
|
Condenser |
Type |
Finned |
|
Air Volume(m3/h) |
120000 |
|
|
Evaporator |
Type |
Shell and Tubes |
|
Pipe Size(DN) |
100 |
|
|
Flow(m3/h) |
45 |
|
|
Protector Device |
1.Phase protector |
|
Chiller Parts Name/ Brand:
1.Compressor: Hanbell/Bitzer
2.Electrical Parts: LG/Schneider
3.Control Panel PLC:Siemens
Delivery Time& Package& Payment
1.Delivery Time: 30-35 working days
2.Package: wooden case
3.Payment: 30% as the deposit,70% balanced before delivery.
About Us:
Why Choose Us
1.Reply your inquiry within 12 working hrs.
2.Strong R&D team,more than 15 years of manufacturing chiller experience. OEM&ODM is welcomed.
3.Direct factory,offer customer competitive price with high quality chiller.
4.Strict quality control system,professional QC team.













